Last edit by: sensei
American Airlines' first Boeing 787 / 787-8 "Dreamliner" delivered at DFW Jan 2015
discussion, current and future deliveries, 1st delivery video link
discussion, current and future deliveries, 1st delivery video link
American Airlines has ordered 16 Boeing 787-8 Dreamliner. Deliveries were delayed by aircraft design and assembly issues, but began to be delivered in 2015. 16 788s are on order (plus 26 787-9s and options for more). Seating configuration is 28 Business Class, 48 Main Cabin Extra and 150 Main Cabin. Typical range would be JFK and HKG or JNB.
With a typical capacity of 242 passengers and a range of 7,355 nautical miles (13,621 km), the -8 is the base model of the 787 family and was the first to enter service in 2011.[257] With a length of 186 feet (57 m) and a wingspan of 197 feet (60 m), it is the third Boeing widebody after the 747SP and the 777-200LR wider than its length. The 787-8 is targeted to replace the Boeing 767-200ER and -300ER, as well as expand into new non-stop markets where larger planes would not be economically viable. Link to full Wikipedia article
Inside American Airlines Newest Boeing 787 Dreamliner
The Dallas Morning News
The Dallas Morning News
Configuration: C28 W48 Y150. #1 of 16 787-8s and 26 787-9s on order (total 42 787s including 787-9s and options for another 58).
Currently active: 17
N800AN, N801AC, N802AN, N803AL, N804AN, N805AN, N806AA, N807AA, N808AN, N809AA, N810AN, N811AB, N812AA, N813AN, N814AA, N815AA, N816AA.
Upcoming deliveries (type, estimated date):
N820AL (789, 22SEP16), N821AN (789, 12OCT16), ZB448 (789, 28OCT16), ZB449 (789, 15DEC16), ZB450 (789, 11JAN17), ZB451 (789, 27JAN17), ZA918 (788, 06FEB17), ZA919 (788, 16MAR17), ZA920 (788, 30MAR17), ZB452 (789, 17MAY17), ZB453 (789, 23MAY17), ZB454 (789, 16JUN17), ZB455 (789, 27JUL17), ZB456 (789, 21AUG17).
Please see AA publicly announces initial Boeing 787 / 788 routes 11 Feb 2015 for announced route and inaugural flights information.
[
PR News Wire: American Airlines Welcomes First Dreamliner
(Post #186 by JonNYC in the archived thread has details for the 787-9.)
Originally Posted by American Airlines
Boeing 787s
We have plans to acquire 42 state-of-the-art 787(-8) Dreamliners, which are currently scheduled to be delivered starting in late 2014
We have plans to acquire 42 state-of-the-art 787(-8) Dreamliners, which are currently scheduled to be delivered starting in late 2014
Dallas Morning News (30 Jan 2015): American expects to accept 12 Boeing 787-8s in 2015.
JonNYC depicts what the J cabin layout is likely here in the deliveries thread.
Bloomberg (27 Mar 2015 - see post #144 from tom911) says ships 3 and 4 are parked "in the Mojave desert" until a seats shortage is sorted out.
some final tweaks, incorporating details gleaned from photos:
roadwarrior84 shares some interior photos he found online, herein the old thread.
The obsolete thread is ARCHIVE: AA 787 Orders / Delays / Changes / Delivery Dates, 2012 and later (consolidated).
[/COLOR]
AA's first Boeing 787 / 787-8 arv. Jan 2015; discussion, deliveries
#16
FlyerTalk Evangelist
Join Date: Nov 2001
Location: Wanting First. Buying First.
Programs: Lifetime Executive Diamond Platinum VIP with Braniff, Eastern, Midway, National & Pan Am
Posts: 17,481
Semi-OT: has anyone else noticed that now that RNAV STARs have been implemented at DFW, 13R no longer seems to be assigned for arrivals from the NW?
Last edited by Herb687; Jan 23, 2015 at 5:43 pm Reason: multi-quote
#17
Join Date: May 2012
Location: MIA
Programs: AA EXP - MR Plat - HH Gold
Posts: 251
on it's way: http://flightaware.com/live/flight/AAL9702
#18
Suspended
Original Poster
Join Date: Mar 2001
Location: FIND ME ON TWITTER FOR THE LATEST
Posts: 27,730
#20
Join Date: Nov 2010
Programs: AA PLT 3MM
Posts: 1,135
#21
Join Date: Jul 2013
Location: DFW,OVB (Russia)
Programs: AA HH Gold SPG Gold BA
Posts: 1,823
#22
Suspended
Original Poster
Join Date: Mar 2001
Location: FIND ME ON TWITTER FOR THE LATEST
Posts: 27,730
#23
Moderator: American AAdvantage
Join Date: May 2000
Location: NorCal - SMF area
Programs: AA LT Plat; HH LT Diamond, Maître-plongeur des Muccis
Posts: 62,948
American has placed firm orders for 42 Boeing 787 aircraft, with the right to acquire an additional 58. American will take delivery of both the 787-8 and 787-9 as part of the 42 firm orders. American expects its first 787 to enter revenue service in the second quarter, flying domestically between American's hubs for several weeks before being launched on international flights. Link.
#26
Suspended
Original Poster
Join Date: Mar 2001
Location: FIND ME ON TWITTER FOR THE LATEST
Posts: 27,730
Indeed, as was covered in the other thread (or threads, not sure) :
http://www.flyertalk.com/forum/ameri...788-route.html
http://www.flyertalk.com/forum/ameri...788-route.html
#28
Join Date: Jun 2009
Location: Ft Worth, TX
Programs: AA, HH
Posts: 451
http://www.dallasnews.com/business/a...dd3122f9678df2
more pic's on this link
http://airwaysnews.com/blog/2015/01/...-8-dreamliner/
more pic's on this link
http://airwaysnews.com/blog/2015/01/...-8-dreamliner/
Last edited by itchief; Jan 24, 2015 at 7:03 pm
#29
Moderator: Travel Safety/Security, Travel Tools, California, Los Angeles; FlyerTalk Evangelist
Join Date: Dec 2009
Location: LAX
Programs: oneword Emerald
Posts: 20,599
#30
Moderator: American AAdvantage
Join Date: May 2000
Location: NorCal - SMF area
Programs: AA LT Plat; HH LT Diamond, Maître-plongeur des Muccis
Posts: 62,948
UPDATE, January 23, 9:50 p.m. EST: Correspondent Austin Speaker was in Fort Worth when the 787 arrived at 7:06 p.m. CST. Operating under the AA delivery flight number of 9702, the aircraft registered N800AN was delayed due to a small software issue. Link.