FlyerTalk Forums

FlyerTalk Forums (https://www.flyertalk.com/forum/index.php)
-   Air Canada | Aeroplan (https://www.flyertalk.com/forum/air-canada-aeroplan-375/)
-   -   Air Canada Airbus A330-300 refurbishments (https://www.flyertalk.com/forum/air-canada-aeroplan/1770960-air-canada-airbus-a330-300-refurbishments.html)

YVR72 Mar 10, 2024 5:58 pm

FlyerTalk Forums Expert How-Tos and Guides
 
Note: please keep this thread to information on the refurbishment program and its progress; for discussion of which seats are best and other details about the interiors, please visit the seating information thread.

A330-300 Fleet Overview

AC currently has two configurations of 333:
  • Dream Cabin (16 aircraft): Latest 3-class configuration in line with the 787 and 777 fleets (seat map)
  • The "Merlions" (2 aircraft): ex-Singapore Airlines 2-class configuration (seat map), which are expected to be reconfigured to the Dream Cabin.
    • Important note: the front cabin on these aircraft is an angle-flat product in a 2-2-2 layout that was SQ's "regional" business class. On flights within North America, AC sells it as J; on international flights, they sell it as PY. These aircraft do not have the standard AC PY cabin
    • Since October 2023, these aircraft primarily operate YYZ>BOG>YUL triangle, and YUL<>LAX.
Status of Dream Cabin Refurbishment

Code:

32J 24O 241Y: 297 pax
C-GFAF (931) Completed @HKG, Oct 01/23 - Dec 09/23 [69 days]
C-GFAH (932) Completed @QPG, Aug 10/21 - Oct 05/21 [56 days]
C-GFAJ (933) Completed @QPG, Nov 24/21 - Jan 12/22 [49 days]
C-GFUR (934) Completed @QPG, Oct 08/19 - Feb 28/20 [143 days]
C-GHKR (935) Completed @QPG, Oct 04/21 - Nov 25/21 [52 days]
C-GHKW (936) Completed @HKG, Nov 27/21 - Feb 21/22 [86 days]
C-GHKX (937) Completed @RFD, Sep 02/20 - May 30/21 [271 days]
C-GHLM (938) Completed @HKG, Sep 30/22 - Dec 11/22 [72 days]
C-GEFA (939) Completed @RFD, Dec 31/20 - Mar 29/21 [89 days]
C-GEGC (940) Completed @QPG, May 17/22 - Jul 21/22 [67 days]
C-GEGI (941) Completed @QPG, Jan 10/22 - Mar 11/22 [60 days]
C-GEGP (942) Completed @QPG, Nov 06/19 - Jul 01/20 [238 days]
C-GHKC (943) Completed @HKG, Feb 21/22 - May 05/22 [73 days]
C-GKUG (944) Completed @QPG, Mar 02/20 - Feb 10/21 [345 days]
C-GKUH (945) Completed @RFD, Oct 08/20 - Jan 12/21 [99 days]
C-GOFV (946) SQ configuration
C-GOFW (947) Completed @QPG, Feb 03/22 - May 20/22 [107 days]
C-GXZD (948) SQ configuration



All times are GMT -6. The time now is 3:29 am.


This site is owned, operated, and maintained by MH Sub I, LLC dba Internet Brands. Copyright © 2024 MH Sub I, LLC dba Internet Brands. All rights reserved. Designated trademarks are the property of their respective owners.