Two items delaying this: TSA is having issues with a security door. It was supposed to be certified but was delayed and the vendor is pushing back on fuel cost that were agreed too prior to $6.00 a gallon currently. I'm still hearing around July though..
Thanks as always for the updates and insight.
With Illinois being among the quarter of the states with the worst gas prices in the country, I can see why the vendor/contract operator would feel like it’s a bad time to get this going if operations are going to start with running losses or on substantially lower margins than budgeted by the vendor. I guess this is what happens when an airport owner/operator doesn’t think some things at the airport are so core to the business operations as to not be outsourced. I dread to think that if the contractor’s fuel costs are so close to make or break then what about their staffing situation (in terms of cost but also availability).