Originally Posted by
Akoz
Floor covering has not been laid yet, only the edge tiles look like they have been stuck down.
I'm hoping that the space above the baggage reclaim text will be for transfers signage. (It might not be ready to open yet and may come later, but the new arrivals route and baggage reclaim was due to open by the end of July).
Builders site signage and temporary flooring was definitely in situ there this afternoon. Both double doors next to gate 5 led into that new corridor. I presume transfers will be redirected back into the departure lounge bypassing domestic arrivals...