Originally Posted by haapalainen
The waiting areas for these gates won't be very big though as I don't think they will increase the size of the terminal building but rather just divide the current space with movable glass walls.
Finavia's page about the expansion program shows that the building would be expanded for gates 37 - 39 (to our surprise). Remains to be seen how correct that is, unless someone over here has access to the information.

Dual-usage gates will require separate access to/from the Schengen area, so that alone would require one more floor. Guiding arriving Non-Schengen passengers to Aukio will also require it.

The South Wing and the 50A-M bus gates already showed that Finavia doesn't want to offer seating at gates anymore, so I'd still expect most of the seating to be enhanced away when gates 32-34 will be renovated to 34-39.

Originally Posted by OH-LGG
Gates 25-33 it's 8 gates with bridge and Blue Wings skips number 31. 31 is renamed as 32. But what is gate 33?
Gate 33 in the map mesmerized me as well. There would be room for one new gate between the current Schengen and Non-Schengen gates, maybe one will be built?

Renaming gate 31 seems logical to avoid confusion with 31A-D. The same thing was done already with gate numbers 50 and 51.