A FlyerTalk Posting Legend
Join Date: Feb 2001
Location: Berkeley, CA USA
Programs: Piggly Wiggly "Shop the Pig!" Preferred Shopper
Posts: 57,074
I just walked past the lounge site (b/t gates 74 &75 in T3F). Looks like at least a month to go of construction. It looks to me that the entrance/exit will be airside. There is a temporary cut-out door facing the gates.