FlyerTalk Forums - View Single Post - MIA / Miami Airport AA Terminal Renovations (consolidated)
Old May 13, 2009, 8:19 am
  #9  
HNL
FlyerTalk Evangelist
 
Join Date: Feb 2005
Posts: 10,949
Originally Posted by whirledtraveler
I keep wondering where I can get more information about the end game on this "renovation." For instance, the walk across the terminal is ridiculously long. Are there any plans for moving walkways? I suppose that if they did that, they'd be up on the second level?
There is a train in the roof.
HNL is offline