Go Back  FlyerTalk Forums > Destinations > Europe > U.K. and Ireland
Reload this Page >

Engineering works London Bridge Train Station from 20th Dec

Community
Wiki Posts
Search

Engineering works London Bridge Train Station from 20th Dec

Thread Tools
 
Search this Thread
 
Old Dec 9, 2014, 7:47 am
  #1  
FlyerTalk Evangelist
Original Poster
 
Join Date: Nov 2011
Location: Brighton. UK
Programs: BA Gold / VS /IHG Diamond & Ambassador
Posts: 14,176
Engineering works London Bridge Train Station from 20th Dec

As part of the Thameslink Programme there are major engineering works taking place from 20th December 2014 to 4th January 2015


There will be NO Southern trains at all (these serve south west London including Gatwick)

There will be NO Thameslink trains stopping at London Bridge - this is mainly the Bedford to Gatwick/Brighton routing - but these are being diverted from Blackfriars via Elephant and Castle

Southeastern (to south east London (e.g. Greenwich) and Kent trains will run but with some changes in the morning peak from Mon 22nd to Wed 24th December.


The closure this time will be to finish most of the works to the terminating platforms part of the station (Southern services) and facilitate the changes from mid-January to the 'through' platforms (to Charing Cross and Cannon Street) where from 12th January services to Charing Cross will not stop at London Bridge until August 2016


Details here
UKtravelbear is online now  
Old Dec 10, 2014, 2:17 am
  #2  
 
Join Date: Sep 2007
Location: London
Posts: 1,546
The engineering works run until 2018, and there will be multiple changes to service patterns throughout the station rebuilding works. The moral being don't rely on any advice in an old thread for London Bridge, as it may well be wrong now.
Through Thameslink trains don't reappear until 2018.
rcspeirs is offline  
Old Dec 10, 2014, 2:26 am
  #3  
Moderator: American AAdvantage, Signatures
 
Join Date: Jan 2008
Location: London, England
Programs: UA 1K, Hilton Diamond, IHG Diamond Ambassador, National Exec, AA EXP Emeritus
Posts: 9,765
At the risk of restating the above, the key takeaway for anyone visiting London in the next month is that there will be no National Rail trains between London Bridge and Gatwick Airport at all from 20 December to 4 January.

Best alternate routes for passengers who would normally have taken this route would be to take a train between Gatwick Airport and Elephant & Castle, Blackfriars, Clapham Junction or Victoria and change to another National Rail, London Underground or London Overground service, or onto a local bus. The best route from Gatwick Airport to London Bridge station itself during this time would be a Thameslink service to Elephant & Castle, then change for the Northern line to London Bridge. I'm happy to offer advice if anyone needs help getting around.
Microwave is offline  


Contact Us - Manage Preferences - Archive - Advertising - Cookie Policy - Privacy Statement - Terms of Service -

This site is owned, operated, and maintained by MH Sub I, LLC dba Internet Brands. Copyright © 2024 MH Sub I, LLC dba Internet Brands. All rights reserved. Designated trademarks are the property of their respective owners.