ATL Masterplan 2021
#1
FlyerTalk Evangelist
Original Poster
Join Date: Nov 2005
Location: Phoenix, AZ
Programs: AA Gold AAdvantage Elite, Rapids Reward
Posts: 38,313
ATL Masterplan 2021
Hi All,
There is proposed for Atlanta Jackson International Airport. They will built more new parking garage in the domestic terminal, the entire concourse T, A, B, C, D will be remodernization, the entire concourse E into the domestic gates, and also, they will built east of Maynard Jackson int. terminal, and proposed new sixth runway, as well. Delta cargo will be relocate, too. They will move to south side of Atlanta Jackson International Airport near sixth runway.
Looks like preliminary ATL master plan out there
http://www.aviationpros.com/news/116...cks-6th-runway
http://www.bizjournals.com/atlanta/b...=image_gallery.
Let the speculation begin.
There is proposed for Atlanta Jackson International Airport. They will built more new parking garage in the domestic terminal, the entire concourse T, A, B, C, D will be remodernization, the entire concourse E into the domestic gates, and also, they will built east of Maynard Jackson int. terminal, and proposed new sixth runway, as well. Delta cargo will be relocate, too. They will move to south side of Atlanta Jackson International Airport near sixth runway.
Looks like preliminary ATL master plan out there
http://www.aviationpros.com/news/116...cks-6th-runway
http://www.bizjournals.com/atlanta/b...=image_gallery.
Let the speculation begin.
#2
Suspended
Join Date: Jul 2010
Location: Orlando, FL Area
Programs: Delta SkySponge ExtraAbsorbent, SPG Gold
Posts: 29,988
I vote that they put a Coke Freestyle machine at every gate. I can't think of a better way to modernize the airport and represent the city of Atlanta at the same time.
#3
Join Date: Jul 2010
Location: On the road somewhere
Programs: DL, National, Marriott, Hilton
Posts: 4,304
Adding "Concourse G, H, and I"
Hopefully that'll be south of rwy 9R/north of rwy 10 as it would be a major hassle to DL and others to destroy the maintenance facility and everything else that's east of concourse F.
Hopefully that'll be south of rwy 9R/north of rwy 10 as it would be a major hassle to DL and others to destroy the maintenance facility and everything else that's east of concourse F.
#4
FlyerTalk Evangelist
Original Poster
Join Date: Nov 2005
Location: Phoenix, AZ
Programs: AA Gold AAdvantage Elite, Rapids Reward
Posts: 38,313
#7
Join Date: Dec 2003
Location: Miramar, FL
Programs: DL Charter DM/3.4 MM, DLAmex Plat, PC Plat, MR Gold, HH Diamond, National Exec Elite, Hertz Gold 5*
Posts: 263
They've had plans for the 6th runway for a long time. Back before the recession and when regionals were really big, the plan was to add another runway and regional terminal out between the 5th & 6th runway for that traffic.
#8
Join Date: Jul 2012
Location: MSP
Programs: Delta PM, Hyatt Discoverist, Hertz PC
Posts: 2,303
They're basically half concourses, as with F. Rather than run in both directions from the plane train, they only go away from where TechOPS is.
#9
Join Date: Nov 2013
Location: ATL Concourse E Skyclub
Programs: DL PM, IHG, Hilton, Starwood
Posts: 199
The biggest thing this is missing: non-sterile people mover connectivity between the Intl terminal the rental car facility and MARTA rail. The south end-around taxiway will be a welcome addition.
#11
Join Date: Feb 2011
Location: CLT
Programs: DL Medialia Platina
Posts: 770
The airport's last master plan envisioned a separate new terminal/gate complex south of the main terminal, but the new one drops that idea in favor of new concourses to the east of the existing ones. That maintains the airport's efficient design and enables easier connection to the Plane Train, airport managers said.
#12
Join Date: Aug 2006
Location: SJC
Programs: DL PM MM, Marriott Titanium
Posts: 3,276
I'm just shocked that someone thinks that ATL needs three new concourses.
I would like to see some money for moving sidewalks along the concourses. Having to connect from B1 to B36 is a royal pain.
I would like to see some money for moving sidewalks along the concourses. Having to connect from B1 to B36 is a royal pain.
#13
Join Date: May 2012
Posts: 349
What I haven't seen answered is whether the new concourses will be designed for international use. I would think so, since apparently E will be converted to domestic and F is nowhere near big enough to handle the peak hours by itself.
#14
Join Date: Dec 2009
Location: RDU
Programs: DL DM+(segs)/MM, UA Ag, Hilton DM, Marriott Ti (life Pt), TSA Opt-out Platinum
Posts: 3,222
#15
Join Date: Jan 2008
Location: KATL
Programs: DL DM/2MM
Posts: 2,032
The article indicated that the South Gate Complex would be abandoned for construction of G-H-I:
The airport's last master plan envisioned a separate new terminal/gate complex south of the main terminal, but the new one drops that idea in favor of new concourses to the east of the existing ones. That maintains the airport's efficient design and enables easier connection to the Plane Train, airport managers said.