Mendoza Airport Repair Closure, September 7 - December 7, 2016
#16
Join Date: Dec 2005
Location: Somewhere between EZE , MAD and GLA
Programs: IB , BA , AA , LATAM
Posts: 865
President Macri will cut the ribbon tomorrow Wednesday at 10.30 am
http://www.diariouno.com.ar/mendoza/...-n1296882.html
http://www.diariouno.com.ar/mendoza/...-n1296882.html
#17
Moderator, Argentina and FlyerTalk Evangelist
Join Date: Aug 2000
Location: MIA / EZE
Programs: Lord of Malbec & all Wines Argentine. AA EXP / Marriott Lifetime Silver / Hertz Presidents Circle
Posts: 35,681
So, where are the posters that were saying that the deadline was not going to be met, etc. etc....??????
Last edited by Gaucho100K; Dec 13, 2016 at 11:03 am
#18
Original Poster
Join Date: Jun 2011
Location: Mendoza, Argentina
Posts: 164
22,934 times bitten, once shy.
Gotta give credit where credit is due, once they decided to close down and rebuild, it went well.
However, there is no way they should built a second runway, they had the space (unlike at Aeroparque). Mendoza is a major airport, there are lots of smaller airports in Chile that have 2 runways.
Gotta give credit where credit is due, once they decided to close down and rebuild, it went well.
However, there is no way they should built a second runway, they had the space (unlike at Aeroparque). Mendoza is a major airport, there are lots of smaller airports in Chile that have 2 runways.