N830MH
Mar 19, 09, 2:43 pm
http://www.flightglobal.com/blogs/flightblogger/2009/03/sixth-and-final-flight-test-78.html
With the final flight test aircraft now in final assembly, the path is cleared for parts to begin arriving for pre-integration for the first production 787 (ANA). The first major parts for Dreamliner Seven are set to begin showing up in Everett later this week when the horizontal stabilizer is flown from Italy.
With the final flight test aircraft now in final assembly, the path is cleared for parts to begin arriving for pre-integration for the first production 787 (ANA). The first major parts for Dreamliner Seven are set to begin showing up in Everett later this week when the horizontal stabilizer is flown from Italy.