Hegenberger face lift has short life
http://sfgate.com/cgi-bin/article.cgi?f=/c/a/2003/01/17/EB43856.DTL
<font face="Verdana, Arial, Helvetica, sans-serif" size="2">By late 2004 or early 2005, BART is expected to begin construction of a rail-guided people mover whose route will run right down the median strip of Hegenberger Road. The project is scheduled for completion in 2008.
The plan calls for some kind of rail-guided vehicle and two stops between the Coliseum BART station and the Oakland International Airport, said Mike Healy, a BART spokesman. The route is expected to run parallel to Airport Drive.</font>
http://sfgate.com/cgi-bin/article.cgi?f=/c/a/2003/01/17/EB43856.DTL
<font face="Verdana, Arial, Helvetica, sans-serif" size="2">By late 2004 or early 2005, BART is expected to begin construction of a rail-guided people mover whose route will run right down the median strip of Hegenberger Road. The project is scheduled for completion in 2008.
The plan calls for some kind of rail-guided vehicle and two stops between the Coliseum BART station and the Oakland International Airport, said Mike Healy, a BART spokesman. The route is expected to run parallel to Airport Drive.</font>